In 2020, The SeaCleaners is testing prototypes in collection systems, automatized rigging and waste-to-energy units.
2019
2019
Finalisation of technical specifications
Tests on demonstrators
Selection of equipments and suppliers
Choice of the shipyard
Preliminary design studies
2020
2020
Detailed design studies
Systems integration
Specification of supply equipments
Planning for the construction
2021
2021
Supply of systems
Start of the construction
Choice of collection areas
Validation of authorizations by the relevant instances
2022
2022
End of the construction
Launch of the vessel
Technical tests
2023
2023
Activation of the Manta
First collection campaigns